Integrated safety case and risk management software
Smarter tools that hold up in the moments that matter
When the stakes are high, uncertainty is a weight no one should carry alone.
RiskFlag’s modular, cloud-native risk management software equips you with the structure, support, and tools to make sound, risk-based decisions when it counts.
One platform, built around the case
A barrier on a bow tie, a row in a register, a claim in a safety case and a check on site are all part of the same case. They are assessed with the same tools, tracked with the same tasks, connected to each other, traced on the same Golden Thread and reported together.
Everything in RiskFlag lives in a case: a building, an aircraft, a site, a system or an operation. Each case draws on four modules, and the same features run through all of them.
Four modules. Use one, or all four
Features that run through every module
- Golden Thread
- Connections
- Tasks
- Assessment tools
- Assurance frameworks
- Reports
- Geotagging
- Ripple
- Assets
- API and MCP
Built by those who’ve seen and felt the weight of a decision that could cost lives
From aircraft to high-rise buildings to cruise ships and other sectors, our team have a combined risk management expertise that spans over 40 years. With previous careers in the military and other high-risk industries, our experience runs through the platform in how it’s structured, how information is presented, and what it enables you to do:
- Clear, risk-based thinking and decision-making when under pressure
- Evidence that’s defensible in courtrooms, boardrooms, or regulatory reviews
- Structured logic that’s easy to follow the moment it’s needed
Because when a decision is going to be challenged, revisited, or relied on, it’s not just clarity that matters - it’s accountability.
A proactive, managed approach to risk
Assess and analyse
Build bow ties to understand accident pathways, define the risk and manage in the digital safety case. Giving you a full-spectrum view of your risk landscape in a single eco-system.
Configure and manage
Shape workflows, assign tasks, and track every change in a shared, auditable space. Giving you clarity and control.
Report and justify
Generate professional reports backed by clear, accessible evidence. Create outputs that look the part and prove your thinking.
RiskFlag’s risk management software modules
RiskFlag is built around four flexible, integrated modules that can be tailored to your assurance frameworks, sector needs, and ways of working. Each module benefits from a set of core features, including assessment, task management, connections, and assurance.
Efficient, collaborative safety case management, built on the proven Claim-Argument-Evidence model and shaped to your sector. Share evidence across projects, build repeatable logic, and make your risk thinking clear.
Understand and represent all possible accident pathways in a single visual chain. Assess your bow ties and link directly to your safety case to inform risk-based decision making.
Capture, assess, and track risks in an intuitive, structured tabular format. Create a risk register or conduct HAZID, Register is fully customisable to reflect your frameworks, with live monitoring and full traceability to support confident, risk-based decision-making.
Plan and carry out inspections across buildings and assets, with QR tags, registers inside checklists and an app for the people on site.
These risk management modules provide you with:
Every file, review, report and key event in a case on one timeline, with every superseded version kept.
Link any two items across any module, so a control is described once and seen everywhere it matters.
Raise a task from almost anywhere, assign it to people, teams or contractors, and link it to everything it affects, so it shows wherever you look.
Your own risk matrices, linear scales, barrier-quality and RAG ratings, applied to any element in any module.
Set out the criteria you work to, and connect each one to the case content that satisfies it.
Write in the built-in word processor or build with drag-and-drop Snippets, then generate reports that combine your words with live case data.
Pin cases, assets and register rows to locations and see your whole portfolio on a map.
Make a change once and repeat it across similar items elsewhere in your organisation, choosing exactly which ones.
Describe what each case covers as a tree, from building to floor to door, and tie tasks, checks and assessments to the right part.
The RiskFlag API is free to use: connect your own systems, scripts and AI agents directly to your data.
RiskFlag connections
Connections link everything in RiskFlag. Tie the tasks in your delivery plan to the claims they support, connect the barriers in your bow ties to the claims and arguments that rely on them, and link register rows and assurance framework requirements to the content that satisfies them.
Open any item and see everything connected to it, so a control is described once and nothing is missed. Connections carry through to your reports as hyperlinks, and Ripple can make the same connection across every similar case at once.
RiskFlag AI · opt-in for your organisation
RiskFlag AI: a team member who already knows the platform
Switch RiskFlag AI on and everyone in your organisation gets an assistant that understands the platform and your records, and can do real work in them:
- Reads and understands your cases, registers, bow ties, evidence and documents
- Creates and updates records for you, with every change shown before it is made
- Reviews a whole case record by record, and reports what it found
- Works on a schedule, and tells your team what needs attention
- Turns existing safety case reports into RiskFlag cases
It works within each person’s own permissions, and nothing changes until someone approves it.
Not just software. Your trusted partner in risk.
We believe people responsible for risk and making high-stakes decisions deserve better – better tools, better thinking, and better support.
Every subscription comes with a 2-hour onboarding session to help you hit the ground running.
Our tech team handles all the updates, so RiskFlag keeps working exactly as it should.
Need a hand? Our team’s here with ongoing support whenever you need it.
Works with the tools you already use
Free to use. Connect your own systems, scripts and AI agents directly to your RiskFlag data, with tokens scoped to one organisation, read or write.
A secure MCP connector lets Copilot and other AI assistants work with your RiskFlag data, within each person’s permissions.
Keep documents in SharePoint and use them as evidence in RiskFlag.
Sign in with Microsoft or Google accounts, matched to your organisation by email domain.
Export to Word, PDF, Excel and PowerPoint, with your own branding and templates.
Export your data and audit records at any time, and all of your evidence in a single ZIP file.
We’re proud to have built industry-defining software, shaped by lived experience and backed by experts who know what’s at stake in making high-risk decisions.
FAQs
RiskFlag’s integrated risk management software supports people making high-stakes decisions. Whether you’re leading on the development of safety cases, managing complex systems, or overseeing critical operations, our tools help you feel confident in the decisions you make – and backed up when they’re challenged.
We know that managing risk isn’t just about compliance - it’s about feeling sure you’ve done the right thing, in the right way.
RiskFlag gives you a clear, centralised space to map, understand, and explain risks. From safety cases to bow tie analysis, the platform helps make your reasoning visible and your decisions defensible, so you’re equipped when it matters most.
Every subscription starts with one or more of our four modules: Digital Safety Case, Register, Bow Tie and Compliance. Each comes with the features that run across the platform, including the Golden Thread, connections, tasks, assessment tools, assurance frameworks, reports, geotagging, Ripple, assets and the RiskFlag API. Software maintenance, updates, and technical support are all included as standard.
The RiskFlag API is free to use, so your own systems, scripts and AI agents can work directly with your data, using tokens scoped to one organisation with read or write access. RiskFlag also connects with SharePoint, and with Microsoft Copilot and other AI assistants through a secure MCP connector. We can also configure the platform to pull data from your existing systems via custom API solutions, which is a bespoke service involving developer support.
We take security seriously and build it into everything we do. Our risk management software platform follows a security-driven approach and is certified to ISO 27001 (information security) and ISO 9001 (quality) by BSI, with features like two-factor authentication, Single Sign-On (SSO), role-based access, encrypted storage, and detailed audit logs - so your information stays protected and private. We are Cyber Essentials+ certified and conduct annual independent platform penetration testing.
No. RiskFlag’s software for enterprise risk management and safety cases runs entirely in the cloud, so there’s nothing to install. You’ll always have the latest version, with updates made automatically. On-premise installation of RiskFlag’s software is also available at an additional cost.
To get the most out of RiskFlag’s enterprise risk management software, you’ll need a web-connected device – ideally a desktop or laptop. A stable internet connection, a modern web browser, and a PDF viewer are required for accessing reports. If your account uses two-factor authentication (2FA), you’ll also need a compatible 2FA app.
Our enterprise risk management software supports the current versions of all major browsers, including Chrome, Edge, Firefox and Safari.
The platform is available 24/7 through a secure web application, subject to planned maintenance and upgrades.
Yes, you can export all user and audit data as a PDF document at any point during your contract. All the evidence can also be exported in a single ZIP file.
Absolutely. While our safety case and risk management software is designed to be intuitive and user-friendly, we offer expert-led training in safety case development, risk management, and bow tie methodology. Get in touch to tailor a session to your team’s needs.
If you choose to. RiskFlag AI is switched on organisation by organisation. Once it is, everyone in the organisation has an assistant that understands RiskFlag and your records: it answers questions, makes the changes you approve, reviews whole cases and runs checks on a schedule, always within each person’s own permissions.
Yes. The RiskFlag app for iPhone, iPad and Android takes compliance checklists on site, with offline working, QR scanning, photos and voice notes. It is coming soon to the App Store and Google Play.
Book your demo today!